Posts Tagged ‘Equipment’

Hot-rolled Steel Sheet

Tuesday, September 6th, 2016

It is noteworthy that the hot-rolled steel sheet is widely distributed in the automotive, shipbuilding, aviation, and is also used in the elements of the foundation of buildings, in bridge construction, manufacturing welded pipes and structures, as well as the bent structures, enclosures electrical cabinets, refrigerators and electronic machines. The company “RosMetMontazh” offers a hot-rolled steel sheet of carbon steel GOST 14637 – steel sheet width of 500 mm and larger (if necessary) the size, thickness 4 mm. Hot-rolled steel sheet GOST 16523 is made of carbon-quality steel heat-treated, as well as steel of ordinary quality thickness of 4.0 mm. Hire certified and always in stock sheet steel hot-divided on the quality of surface finish on the edge of nature, the ability to extract, by flatness, accuracy rolling in size. Depending on the mechanical properties of rolled sheet in the manufacture is divided into five categories of steel sheet defined by tests of strength, the ability to extract, etc. By product list Hot-rolled steel is classified into sheets and rolls of steel 10 marks (St3kp, St3ps, St3Gps, St4ps, St4sp, St5Gps and others). Speaking of products such as sheet steel, in addition, it is worth noting that the company can vysheoboznachennaya osuschesvit supply of steel plates of any size and dostaivt them in any region of Russia. Delivery in this case may be, or w / e or transport trucks. Order custom hot-rolled steel sheet size and any number of “RosMetMontazh” from the delivery vehicles at the customer’s. Perhaps galvanized hot, cold and thermal diffusion methods on their own production (dates – by arrangement). The company “RosMetMontazh” has its own equipment for metal, so cutting, picking, loading the required steel is in short terms, and delivery of a professional forwarder.

Outside Walls

Tuesday, August 23rd, 2016

The best form of septic tank – a round. The thickness of the walls should be at least 25 cm Place entrance to septic pipe which flowed from the house of fecal water, should be located at 5 cm higher than the pipe through which water flows from septic tanks into the drainage system. Wastewater enters the septic tank and leaves the tee through a 100 mm diameter, which establish the electrical and outlet pipes. The upper ends of the tees are still open, and above them make clean – tubes of the same section, and so that the gap between the tee and cleaning up at least 5 cm from the lower ends of the tees attached to them pipes must be of such length that they were 40 cm below current water level in the septic tank. Septic tanks are ventilated through an underground filtration riser domestic sewage at home, which should be displayed above the roof. The filter pit. The filter wells make good use of sandy and sandy loam soils with a quantity of waste water up to 1 m3 per day. Filter wells, as wells and septic tanks, perform reinforced concrete rings, bricks, concrete, rubble stone.

Filter size rectangular wells should be 2.8 * 2 m, depth 2.5 m, if a well-round, then at the same depth, its diameter should be 1.5-2 m wide filter bottom well satisfied with a height of 0.5 – 1 m of gravel, crushed stone , slag, etc. The walls of the filter inside the well should be plastered with cement mortar. In exterior walls and foundation to get well and sprinkled from the same materials used for the filter. Sump. Cesspool do with not less than 0.5 m3 per person. The average of the dimensions: length 2.5-3 m, width – 0.8 – 1 m, depth – 1.5 m. The walls of the sump is made of brick, stone or concrete, then plaster with cement mortar, steel, and is sometimes covered a layer of bitumen.

If manufacture of wood walls used, they should be solid, well-covered, double prokonopachennymi and bitumen. The walls are insulated on the outside layer of fat clay 25-30 cm, carefully compacting it. The bottom of the sump to make bias toward the hatch. Then at the bottom put a layer of fat clay 25-30 cm thick, and the top plank boards or concreted. Overlapping holes could be made of wooden boards, covered with roofing material, but better and more reliable to make it out of concrete, As we told above. In the overlapping arrange hatch 0.7 x0 7 m. The overlap is also an insulating layer of clay 30 cm thick and covered with earth on top. Cleanout opening should be two tightly closing lids, one of which done over the overlap, the second – at ground level. Cleaned the sump, depending on its content. Installation of sewerage systems in private homes and apartments almost identical, except that in the flat all sewers connected to the common sewers, and in a private home – with the individual.

Jacuzzi

Sunday, August 21st, 2016

Set the bath, regardless of its execution, whether cast iron or acrylic, often does not require special skills and too much effort. If, in order to install a bath of cast iron without any help you can not do, the installation of acrylic baths afford to almost everyone. It is important to only take a responsible approach to this process. In this article, you will learn how to properly install acrylic bathtub. But first, let me give a little advice: do not buy cheap imitations, since the installation and use of a bathroom will give you a lot of problems. Preliminary work.

The first step is to prepare the room where the bathtub will be installed. All plumbing findings should be placed in an accessible place, to ensure unhindered access to them. The siphon is located at a distance of 12-16 cm from the floor. Before installing, it fits on the tub side, and made installation of a siphon with the release and overflow. During the installation of acrylic bath should be as close as possible to the wall. It is also recommended that it was a slight bias toward release.

Joint sewer pipe (Which is inserted into the outlet) and siphon zavaltsovyvaetsya. Installing a bath. Immediately install acrylic bath itself begins with pouring the cement pad on which, in fact, will draw a bath. Bath mounted on a special frame made in the factory or on their own. Further, this frame is hidden beneath decorative panels or tiles. If you decide to make a frame on their own, remember that it must have high durability and reliability. As practice shows, is much easier installation process, when the surface of the frame is lined with tiles. If the tiles are not laid, the acrylic bath should be lifted above the surface of the frame, tucked under bath rim installation, the appropriate thickness of the tile and mastic adhesive layer. As the pads, you can use the material at hand: cutting boards, pieces of plywood and pr.Kogda all pads are evenly distributed around the bath, carefully (so as not to break the established drain-corrugation and other services!) tilt the tub to the side of the wall and attach the long leg. Then also gently lower it and raise the nearest edge to deliver the remaining legs. While the cement foundation has not had time to dry bath in the lower opening frame. Adjustment mechanisms that are provided with legs retention of most current models of acrylic bathtubs, makes it easy to center the bath. Under the protruding corners better than anything put under that bath not prosela.Esli you are installing an acrylic tub with Jacuzzi it's time to connect the equipment (motor with a pump spray, a control system, etc.). Such activities require compliance with all security measures, so the mains voltage must be disabled until completion of all work on installing the tub. After completion of installation work, fill the bathtub with water to determine the tightness of all plumbing connections. You can use the bathroom after a full drying cement osnovaniya.Scheli that arose during the installation of bath tubs between board and wall repaired with silicone sealant. Larger gaps can be closed using the failed foundation of brick or assembly foam. The final step is installing the decorative panel.

Water For Homes

Friday, August 19th, 2016

Happy owners of country houses, villas or cottages know how important it is to have a private house a permanent source of clean water for their needs. Because water is used primarily for personal use rights (drinking, cooking, sanitation purposes (washing, cleaning)) for irrigation areas, vegetable gardens and in small and large industries can continue indefinitely. And lately especially important role in the life of pure water rights, as more and more polluted atmosphere, soil, food, etc. Whereas previously you could just dig a pit in the country, and use them for several decades for their needs without compromising the health of man, at the moment the situation has changed dramatically. Upper aquifers of the soil, where the diversion of water from wells, is often contaminated by industrial waste, human waste … And often the only way out of this situation is to drill their own wells. Well for home and industrial wells are different and in this article we will describe in detail the advantages and disadvantages of both wells types.

For home use 2 types of wells: wells in the sand (sand wells) and wells in limestone (artesian wells). Wells in the sand is used when it is necessary to organize the supply of small houses, watering small areas cottages, where there is no need large amounts of water. Drilling wells in the sand is at a shallow depth, it is mostly 15-30 meters, which are affected first water-bearing strata (sand horizons) hence the name – well on the sand.

Basement

Thursday, August 18th, 2016

Immediately after the pier foundation of the universal device hozbloka (house-barn-bath) begin to build his basement with a device to let a temporary but very comfortable accommodation. For this need to build walls and partitions to the device insulated basement floor and a temporary roof, install windows and doors, lay floors, put the oven and do the finishing work. And all this must be done in the shortest period of time to quickly move out of the hut, where you from dear paradise in the basement, where your beloved will be a paradise with you. This is important. So let's keep building arhiforsirovanno ground floor with the most simplistic, but at the same time reliable and durable design elements. Before proceeding to the device headroom for pier foundation, must decide what will be Basement walls: wood or brick? In the case of wood, enough of one pillar, with no connection to each other randbalkami (beams, supported by foundations and bearing the walls, partitions and other loads). If exterior walls are brick, without randbalok not do, it will go on laying. This is well illustrated in the drawings the walls of the basement options.

First thing to do would be to establish the level of headroom and a total for randbalok formwork. For the simplest level, but fairly accurate, fit the usual bottle of vodka or brandy, the wine is no good: dark bottle – difficult to see. At the end of a bad one can take a bottle of water (although the water even safer – longer used.) If, however, will enjoy a bottle of, say, with vodka, the first use it as a level, and then Empty! In any case not vice versa! Why such a technological sequence, I hope have guessed.